The Cost of Rework
Rework consumes the same resources as first-pass production, labor, machine time, materials, floor space, but produces no additional value. It also consumes leadership attention, disrupts flow and pushes back downstream delivery. And because rework is often done off the main line, it hides from OEE and cycle-time metrics that only measure the main flow.